Design and delivery of award winning Cross Laminated Timber (CLT), Glulam and hybrid structural solutions LEARN MORE GET IN TOUCH

Innovative

We bring an in depth knowledge of conventional construction and offsite mass timber construction that enables us to provide you with the best solution. Our innovative approach to problem solving leads to fast and efficient delivery of even the most challenging projects.

Since forming in 2011 we’ve delivered many multi-award winning projects across all construction sectors from multi-storey residential, educational and workspace buildings to bespoke private homes, rooftop extensions, garden buildings and other small projects.

Since forming in 2011 we’ve delivered many multi-award winning projects across all construction sectors from multi-storey residential, educational and workspace buildings to bespoke private homes, rooftop extensions, garden buildings and other small projects.

CLT is a fast, clean and highly efficient method of offsite construction resulting in zero embodied carbon, low energy use buildings that meet NZEB targets. CLT’s excellent airtightness and thermal performance can help your building achieve passivhaus standards and mean that occupiers will benefit from ongoing energy savings when compared to traditional methods of construction.

CLT is a fast, clean and highly efficient method of offsite construction resulting in zero embodied carbon, low energy use buildings that meet NZEB targets. CLT’s excellent airtightness and thermal performance can help your building achieve passivhaus standards and mean that occupiers will benefit from ongoing energy savings when compared to traditional methods of construction.

Responsibly sourced engineered timber products such as CLT and Glulam are precision pre-fabricated to mm tolerance resulting in a zero waste construction phase. This means a cleaner site with fewer site operatives, fewer deliveries and minimised disruption to neighbours.

Responsibly sourced engineered timber products such as CLT and Glulam are precision pre-fabricated to mm tolerance resulting in a zero waste construction phase. This means a cleaner site with fewer site operatives, fewer deliveries and minimised disruption to neighbours.

“We’re currently working on our second private residential CLT project with G-frame. They’re a very solutions based company and are great to work with. At our first project, County Down Barn, the G-frame team developed an innovative way of installing the CLT structure, where the trusses are placed on top of the roof and the roof is ‘hung’ from them, so that only the tie beams are visible internally.
The initial brief was to have no trusses and to use twice as many beams placed externally, but this added too much cost and G-frame were able to design a solution that works really well, uses less timber and opens the space for zoning, which is a major benefit.”


Micah Jones, Micah Jones Architects County Down Barn, Grand Designs – series 18, episode 3

G-frame Structures, CLT, Cross Laminated Timber, Glulam, Hybrid Frame, barn conversion, renovation, private home

“We’re currently working on our second private residential CLT project with G-frame. They’re a very solutions based company and are great to work with. At our first project, County Down Barn, the G-frame team developed an innovative way of installing the CLT structure, where the trusses are placed on top of the roof and the roof is ‘hung’ from them, so that only the tie beams are visible internally.
The initial brief was to have no trusses and to use twice as many beams placed externally, but this added too much cost and G-frame were able to design a solution that works really well, uses less timber and opens the space for zoning, which is a major benefit.”


Micah Jones, Micah Jones Architects County Down Barn, Grand Designs – series 18, episode 3